Refine your search:     
Report No.
 - 
Search Results: Records 1-3 displayed on this page of 3
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Development of three-dimensional diffusion and burn-up code HIZER for Monju core management

Kato, Shinya; Shimomoto, Yoshihiko; Kato, Yuko; Kitano, Akihiro

JAEA-Technology 2014-043, 36 Pages, 2015/02

JAEA-Technology-2014-043.pdf:8.94MB

The core management and operation code system aims to perform core management task efficiently by systematic management of data, analyses and edits, which are needed in the reactor core management and operation. The system consists of the five calculation modules: the reactor constant generation module, the neutronic-thermal calculation module, the radiation analysis module, the core structural integrity estimation module, and the core operation analysis module. In these modules, the neutronic-thermal calculation module is based on the dedicated three-dimensional diffusion and burn-up code HIZER. HIZER can execute core calculations easily for specific design specification and operation patterns of Monju, enabling efficient and accurate evaluation of the Monju core characteristics. This report describes its calculation method and validation results.

JAEA Reports

Partial replacement of JMTR beryllium frame

Kaminaga, Katsuo; Tsuboi, Kazuaki; Kusunoki, Hidehiko; Asano, Norikazu; Yanai, Tomohiro

JAERI-Tech 2003-051, 26 Pages, 2003/05

JAERI-Tech-2003-051.pdf:2.67MB

The sixth replacement of beryllium frame has been accomplished for the west and north frame, while the old east frame of fifth generation is preserved for use. JMTR achieved its first criticality in 1968 and has been in operation until today, with an integrated thermal output of 141.454.5 MWd. During that period replacement was carried out 4 times for all the frames, east, west and north. This time, differently from the previous replacement, west and north frames only were manufactured and installed, when the old east frame was left for continuous use, based on the past experience. Such a strategy contributed to reduction of budget and the waste associated.

JAEA Reports

None

*; *; *

PNC TJ9582 96-001, 11 Pages, 1996/03

PNC-TJ9582-96-001.pdf:1.0MB

None

3 (Records 1-3 displayed on this page)
  • 1